We follow proper procedures to ensure your safety as well as our own.
Setup
- Rooms to be painted on that day will be scheduled with the customer prior to painting.
- All furniture is to be placed carefully to the centre of the room.
- Furniture will be covered with durable plastic if necessary.
- All floors will be covered with drop cloths to avoid paint splatter.
Preparation
- Walls are sanded and scraped, if the situation requires it.
- All holes and cracks are filled and sanded to perfection.
- Gaps in the trim are to be caulked if requested by customer.
- Washing will be done where necessary.
Painting
- Repaired areas get a coat of primer before the color of choice is applied.
- The colour selected will be applied with the combination of a brush, roller and/or sprayer.
- Walls and/or ceilings will ALWAYS be painted until 100% coverage is unveiled.
- Perfect cut lines between the ceiling to wall and the trim to wall.
Clean-up
- Furniture is moved back to their original position prior to painting.
- Floors will be swept and/or vacuumed.
- All waste materials to be bagged and taken away courtesy of Painting Canada Inc.
- Extra paint will be bottled and labeled for extra convenience for our clients.
Inspection
- Before our employees gather their equipment, a thorough walk-around will be done.
- The client will do a walk through with the manager to ensure 100% satisfaction.
- All touch-ups are to be fixed right away to the satisfaction of the client.
- Post-It Notes are given to each client which they can use to mark any imperfections or places that require additional touch-ups. Painting Canada Inc. will be back within 24 hours to fix it, GUARANTEED.